Sulfur Solutions

Purpose is to fund $ 207, 841 for Testing and Manufacture of designed models

Facebook Twitter LinkedIn

Patented Blend of Esters that assist in minimization of SOx from Coal-Fired plants. The wave of our transportation future is Electric Vehicle's. The elephant in the garage is generating cleaner electricity. I have a method of removing up to 35% of the SOx from the power plant emissions.  The cost is about $ 3.60 per ton of Coal without complicating the emission picture. My process does not introduce any new hazards since my product is 'clean'. One unintended consequence is the minimization of H2SO4 (Sulfuric Acid Rain)  

My Patent Date                + Publishing                                        6/01/2013                                                            Cost    $ 38,324

Test Laboratory will record all of the byproducts and their percentages                                                 84,286    

Blend of 2 Esters that reduce 35% of SOx from Coal Flue Gases.  The Ester’s are burned 

with the Coal and resultant byproducts do not include any SOx's 

Travel and Shipping for testing(Minnesota)                                                                                                               15,476

Design of Delivery System (Trade Secret, protected)                                                                                          16,571
 
Advertise for Technician & Contact Meeting and Negotiation (SLC)(travel and lodging)                2,665 

Research for Suppliers and Meeting for Negotiations                                                                                         2,825

Desktop Computer w/Software                w/2 laptops                                                                                          12,847    

Web page and Advertising                                                                                                                                                18,572

My time for travel and to meet with Principals (SLC, CA, U of A) 465 @ $ 35.00                            16.275

TOTAL                                                                                                                                                                                   $  207,841

The problems that the ‘new’ technology of EV’S require charging of batteries. All of the units involved with transportation or heating and cooling still have no alternatives for generating the life blood of the process. Solar Panels can produce electricity only when the sun is shining and one huge problem associated with Solar Panels, the panels contain hazardous materials with a usable life of 10 to 12 years. Wind Turbines require wind and the wind turbine process environmentally currently require electricity to be generated by normal power systems to accommodate lack of wind and out-of-service wind turbines.

 Market includes world-wide distribution to all Coal-fired plants especially power generation facilities.

Ready to Ask For Funding for your company?

Post a Funding Request

Sulfur Solutions is no longer seeking funding.