Omega-Comfort LLC

Ground-up Building construction to house an EPS manufacturing plant.

Facebook Twitter LinkedIn

3D-EPS is the construction material of the future:   3 hour fire rating, Insulation up to R 63 possible, 269 MPH wind certification, 9.0 on the righter scale availability, 60 DB sound attenuation , NEVER have to deal with termite, bugs or other rodents.  Just to ad a bit of "insult to injury" final cost of the building is 15 to 20% less than any other way of building. 
   We are the only 3d-EPS manufacturing facility in USA. 
 Recently, due to a full consolidation of EPS manufacturing we found ourselves severely limited in production, in danger of complete shutdown because of that.  We have to import the EPS from Mexico and beside the extra expense for transportation and import taxes,  we are also limited by the amount available and, sincerely , the trust-worthiness of the Mexican manufacturer.  Timing sims to be one unknown term in Spanish  and we are only able to acquire only about 12 day wort of material at a irregular time during the month. That create an insurmountable problem for long time viability of the business.  To eliminate the threat we decided to produce our own EPS. We purchased the equipment but we need to erect a different building to house it because of open flame (ark welding  continual in the original building).  We have the wall material,  the roofing material and all the equipment for production but we need funds for plans, permits, foundation, slab , electrical and plumbing .  At full speed (with one shift) we can easily gross $340.000 a month but with out a guaranty of availability of the EPS material I can not accept any larger volume  orders.  We need a loan of approx . $350.000 for 12 months for a ground-up construction,  Open for negotiation.

Ready to Ask For Funding for your company?

Post a Funding Request