TransElectric Corporation

Raising initial development capital for phase one of our HEF-TEG Process project.

Facebook Twitter LinkedIn

Project Overview: Our proposed project aims to fundamentally revolutionize the energy industry by developing and deploying a highly efficient and sustainable energy production process that has no by-product and zero negative impact on the environment. Our electricity generation process produces no natural resource depletion regarding energy production. In our opinion the Hydro-Electrolysis Fueled Thermal Electricity Generation Process has the potential to address urgent energy challenges while contributing significantly to the global transition to a carbon-neutral and ecologically balanced future. Through this project, we intend to:
 
     1 - Conduct Extensive Research and Analysis: We will conduct rigorous research and analysis on our proof-of-concept model to develop the process.
 
     2 - Pilot Plant Construction and Testing: Based on the research findings, we will design, engineer, and build a pilot plant to test the feasibility, efficiency, and environmental                                          sustainability
            of the proposed energy production process. Rigorous testing will be conducted to optimize the system's performance and ensure its scalability.
 
     3 - Sustainable Process Optimization: We will focus on refining the energy production process to maximize energy efficiency, minimize waste generation, and eliminate any negative                    environmental impacts. This will involve incorporating sustainable practices, utilizing recyclable materials, and minimizing water and energy consumption.
 
      4 - Business Plan and Market Deployment Strategy: We will develop a comprehensive business plan and market deployment strategy that outlines the commercialization pathway for                 this sustainable energy production process. This will include market analysis, economic feasibility studies, intellectual property protection, and strategies for partnerships and                           collaboration.
 
Process Description: The Hydro-Electrolysis Fueled Thermal Electricity Generation Process consists of 5 sections working interdependently to produce clean electricity. The 5 sections consist of:
 
      A. - Photovoltaic Array

      B. - Fuel Production Pool

     C. - Thermal Reaction Chamber

     D. - Containment Vessel

     E. - Standard Steam Turbine/Generator

A.      The Photovoltaic Array - The first step in the process and is comprised of an unspecified number of photovoltaic cells mounted on an array. The electricity produced by the array is                 sent to the Fuel Production Pool to provide electricity for the electrolysis process and to recharge a power bank used for nighttime fuel production.
B.      Fuel Production Pool - The second step in the process and is where electrolysis occurs, splitting the water in the pool into its component parts hydrogen and oxygen. Both gases                       are collected after electrolysis and sent to the Thermal Reaction Chamber. The gases provide the fuel for thermal reaction. 
C.      Thermal Reaction Chamber - The third step in the process and is located within the Containment Vessel. After receiving the gases from the Electrolysis Pool, the two gases are                         recombined via a thermal reaction which produces heat and water as its byproducts. The water is condensed in an ancillary system for reuse or vented into the atmosphere. The                     heat produced from the reaction is sent to the Containment Vessel via thermal conduction.
D.     Containment Vessel - The fourth step in the process. It is filled with water and contains the reaction chamber (which is surrounded by the water). The water in the vessel absorbs                     the heat being transferred from the reaction chamber by conduction and is turned into steam. The steam creates pressure via expansion and is sent to the Steam Turbine                                      Generator(s).
E.      The Steam Turbine/Generator - The fifth and final step in the process. The Steam Turbine/Generator receives the pressurized steam from the containment vessel and the turbine                   spins from the pressure making the generator produce electricity. The electricity produced is then sent to the public power grid for consumption.
F.       Ancillary Systems - there are two main ancillary systems associated with the Hydro-Electrolysis Fueled Thermal Electricity Generation Process. The first is the nocturnal                                     continuation power reserve - recharged by the photovoltaic array and plant power output – which is used for nighttime fuel production. The second is the H2O byproduct recovery               system (condensing and subsequent reuse of the water produced during thermal reaction).

Expected Outcomes and Impact:
The successful development, implementation, and deployment of the Hydro-Electrolysis Fueled Thermal Electricity Generation Process is an environmentally sustainable energy production process which will yield remarkable outcomes and significantly impact climate change on a global scale. The process will significantly reduce or eliminate the carbon footprint associated with energy production.